How Long Does It Take to Do a Full Home Remodel?
Facebook
Twitter
LinkedIn
Home renovations require a lot of planning, patience, budget, and good organization. It can be stressful and derail your life. A full home remodel is a massive step that impacts your everyday life and routine in every way. It can last months and requires a detailed financial structure, well-coordinated activities, and usually building permits. Homeowners should plan for several years, and it is only logical to take this step if there are serious structural issues or things you simply must change around your home. However, it is also an exciting and transformative change in your life.
It is not always possible to have a general, precise estimation of home remodeling since it depends on many different aspects we cannot always control. Many factors are in play here, and each construction company, each building permit office, and many others involved in this process have different turnaround times. However, stay with Bluegrass Haven as we try to give as accurate a picture as possible of how much time you will need for a full home remodel.
What Is a Full Home Remodel
А complete renovation of a house is construction work that includes changing the home to a large extent or the entirety of it. At the same time, it is not uncommon to change the home layout, including demolishing walls, adding rooms, and similar activities, as well as changing the exterior, windows, and more.
Factors That Change the Estimated Time of Home Remodeling
Many factors are involved in home remodeling. These are some of the most important, on which the length of the work depends the most:
The Gear You Must Have To Conduct a Quality Bathroom Remodel
- The extent of remodeling. Changing the house to a large extent, such as making structural and layout alterations, will consume more time.
- Size of the home. Bigger houses take more time to remodel because of the high volume of work.
- Design and finishes. Custom work designs and finishes are more complicated to remodel, and the contractors will need more time.
- Permits and regulations. Permits are a factor that homeowners can’t control. If needed, they require time to be acquired and depend on the permit offices.
- Availability of materials. If the needed materials are always available, the process will go smoothly. Otherwise, the estimated time will increase due to waiting for them to be back in stock.
- Availability of contractors. Different areas in the US have different contractor markets. If you are lucky enough to be located someplace with enough contractors on the market, the estimated time of finishing your project will be lower.
- Weather. The weather impacts projects involving outside work, such as foundation, framing, and home exterior, as they cannot be carried out during extreme weather. The optimal season for home remodeling is usually early spring. When the work moves inside, the weather has less impact.
- Budget. When the budget is limited or there are financing delays, the pace of the project will be slower.
- Project management. Lower levels of project management can cause delays and a slower pace of work.
The Phases of Full House Renovation
A full home remodel involves the following consecutive phases:
- Planand ning design
- Obtaining permits
- Pre-construction preparations
- Demolition
- Structural changes
- System installation
- Insulation install
- Interior finishes
- Inspection
Planning and Design
Planning and design are the first phases of home remodeling. Here, homeowners define the goals they want to achieve with the remodel, establish a well-constructed budget for the whole project, and determine the design in collaboration with architects or designers. The average budget for a full home remodeling for an average home in the US can go up to $200,000.
Obtaining Permits
Regarding the permits, different requirements apply in different locations, as they depend on the state and the city. Full house renovations with architectural planning usually require building permits from the bureau. They are busier in the spring, as more people are trying to obtain building permits, so make sure you take that as a factor that can slow the pace of the project. These first two phases of the project should take around four months to complete.
Pre-construction Preparations
This phase includes hiring contractors like Bluegrass Haven to work on the project, finalizing contracts, and preparing the site. By this stage, during the talks with your contractor, you will be able to make a final estimate of the finishing time. It varies depending on the factors we already described, but it usually takes four to six months once the work starts.
Demolition
In this phase, the contractors demolish all the existing parts that homeowners want to change, and the works have started. Demolition includes existent finishes, walls, and anything else. After this, we must clean the construction site before the next phase.
Structural Changes and Framing
This phase usually takes the most time. The works include changes in the layout, foundation, and roofs. New framing construction for the walls and other structural elements also takes place.
System Installation
In this phase, the work includes updating or installing an electrical system, along with repiping, and an HVAC system. The installation of wiring, outlets, pipes, heating, ventilation, and air conditioning are some of the jobs that happen during this phase.
Insulation Install
The next phase is installing insulation in the walls, ceilings, and floors. This helps with energy efficiency. The next step is preparing the house for painting, including texturing the surfaces.
Interior Finishes
The interior finishes phase includes painting the walls, installing new floors, and installing cabinets and plumbing fixtures.
Inspection
Inspection is the last phase of the home remodeling project. Homeowners usually do the inspection, although it may involve local authorities. They inspect all the work done by the contractors and check if it complies with the contracts. All works must meet the quality standards set at the beginning of the project. If needed, the homeowners can arrange a walkthrough together with the contractor to ensure both sides are on the same page. The planning, construction, and inspection process usually takes eight to twelve months to be done correctly.
Finishing Your Full Home Remodel with Bluegrass Haven
Taking on a full home remodel is a big project that needs careful planning and attention to detail. From the initial design to the final touches, our team ensures your project is managed with expertise and precision. We tailor our services to fit your specific needs, making sure the final result exceeds your expectations. We handle all of the complex parts of the remodel, so that you can enjoy all of the new exciting changes!